Got the Hilltop Fortress / Crack House about finished. Just a bit of touchup here and there that needs to be done. Got a bunch of new stuff around the outside and down by the road that is being planned but it’s playable right now so will be open for the next Open Play day which is coming up on the May 19.

This is the entry as seen coming up from the road. We extended it by another pallet length to provide a bit better protection for the defenders.

And an inside view. Should provide good cover now.

Center divider with added bracing. No longer portable but much more stable.

Front extension from the inside. Plenty of room for 2 or more to cover the trails coming up.

Rear L shaped entry from outside. We added another pallet and more plastic to this one too. Much harder to see or shoot into the interior now.

Inside view of the rear L shaped entry. Added bracing and a small pallet to help support the walls.

Pallet chair. This is made from 2 of the small pallets. Cut one into 2 pieces and then screwed them together then to the full one about half way up.

Back view.

Bottom view. Note the 2×6 added bracing in the center. Also added a piece of the sheeting to the ends for additional stability.

As visible here. Then added the top piece of plastic sheeting for the seat. Sucker is comfortable and reasonably water proof.
After sweltering up on the hill for most of the heat of the day we went down to the DEA headquarters to see how much more we could get done before collapsing for the day.

Got another piece of siding and the center trim on the front wall. Also added some 2×4’s for the door frame and top header.

View of the front wall from the inside.

View of the back wall. This is the full length now with the added 6 foot sheet past the door frame.

Back wall from inside. Temp bracing in the lower left of the picture. Soon as the end wall starts going up that will be removed.
Hope to get the outside of this building finished tomorrow.  Then for the finish work on the doors, windows, and inside walls. My current feelings on the inside is to use the existing finished area as the holding cell with the end we are working on now being used as the DEA office and drug storage area.
More to come as we get it built…
Wolfie